0
0 0 0 0 0 0
0
0 0
Message
0ID:
0PW:
0forget pwd? | Join now
0
0
0
Online: Member 2 Guest 2
0
0
0


0
MSN: test104tw@hotmail.com
0
0
  • Microsoft 70-502 Q & A 115 Questions. (2012/2/7)
  • CISCO 642-611 Q & A 101 Questions. (2012/2/7)
  • IBM 000-R01 Q & A 326 Questions. (2012/2/6)
  • Check Point 156-915-65 Q & A 127 Questions. (2012/2/6)
  • Microsoft 70-515 Q & A 124 Questions. (2012/2/2)
  • SUN 310-230 Q & A 175 Questions. (2012/2/2)
  • IBM 000-206 Q & A 107 Questions. (2012/2/1)
  • EC-Council EC1-350 V7 Q & A 261 Questions. (2012/2/1)
  • IBM 000-435 Q & A 156 Questions. (2012/1/19)
  • HP HP0-J12 Q & A 120 Question. (2012/1/19)
  • Oracle 1Z0-053 Q & A 200 Questions. (2012/1/18)
  • Microsoft 70-642 Q & A 190 Questions. (2012/1/18)
  • LPIC 117-102 Q & A 126 Questions. (2012/1/17)
  • Microsoft 70-640 Q & A 331 questions. (2012/1/17)
  • Microsoft 70-528 Q & A 111 Questions. (2012/1/16)
  • IBM 000-315 Q & A 106 Questions. (2012/1/16)
  • IBM 000-150 Q & A 120 Questions. (2012/1/13)
  • Microsoft 70-632 Q & A 135 Questions. (2012/1/13)
  • EC-Council EC0-350 Q & A 339 Questions. (2012/1/11)
  • CWNP PW0-104 Q & A 110 Questions. (2012/1/11)
0
0
0
Name:
E-mail:
Telephone:
CheckCode: 0

Suggestions & Questions:

 

0
0
0
::Visitors::
000230926

 

 

Cisco powers up router, switches for smart grids[2010/5/26]
[TextSizeBig Middle Small][Print]
Cisco this week is unveiling a switch and a router designed to help utilities construct IP-based infrastructures for power delivery, monitoring and control.

Cisco has said it expects the market for smart grid communications infrastructure to be $20 billion annually over five years.

The new products are the Connected Grid Router 2010 (CGR 2010) and Connected Grid Switch 2520 (CGR 2520). Both run Cisco's IOS software and are based on existing Cisco products for enterprise networks, but support power utility-specific standards and protocols, such as supervisory control and data acquisition, or SCADA.  


The CGR 2010 is based on Cisco's Integrated Services Router, of which 8 million are installed. It features four slots for housing Gigabit Ethernet fiber or copper LAN and WAN interfaces.

The switch, the CGS 2520, comes in two four-slot versions: one sports 24 10/100BASE-TX ports and two Gigabit Ethernet uplinks; and the other features 16 Fast Ethernet SFP ports, eight 10/100BASE-TX and Power over Ethernet ports, and two Gigabit Ethernet uplinks. These switches are based on Cisco's Catalyst 2000 and 3000 series devices.

Two software images are available for the CGS 2520 -- one for Layer 2 services only and the other for Layer 3 IP services.


The products also support cybersecurity features to help utilities comply with North American Electric Reliability Corp. / Critical Infrastructure Protection standards. They include Cisco's Intrusion-Prevention System and Cisco Network Access Control capabilities, MPLS VPNs, firewalls, user/device identity and access control capability.

The products also adhere to IEEE 1613 and IEC61850-3 standards for utility substation environments, including the ability to withstand a broad range of temperatures, as well as extended protection against electrical surges and electromagnetic interference.


For network and power distribution management, both products are designed to capture and analyze information from multiple intelligent electronic devices in the substation. This helps utility operators identify, isolate, diagnose and, in some cases, automatically repair faults.

Citing industry research, Cisco says implementation of smart grid technologies could reduce carbon emissions globally by 12%.

Pricing for both products start at about $6,000. The router will be available in July while the switch will be available in August.



0